I plan to do some grade work after the paving contractor has finished the pads and drives for the shop. Just under 5,000 sf. I have a 200 x 600 foot wooded lot, aproximately 3 acres. The house sets about 400' back. The gravel road could use a new topping. The back-hoe is also a big plus. The dozer cleared the area for my pad but I should have taken a few more of the trees out. From what I have read I don't think the BX will have any problem with the 5-6" and smaller I have to remove. My property grade falls about 2'' for 10' so so terracing and more retaining walls are in the future. Landscape, flagstone deck and on and on. I had planed to contract it out but after dealing with a few bad eggs I figure I can do it myself, do a lot better job and have a good time doing it. Beside a old putter like myself needs the exercize. If I can figure out how to post pix I will give it a try.