Local PUD/Electric Association New connection Issues

   / Local PUD/Electric Association New connection Issues #11  
I had a very similar experience to Oosik when Inland Power did my 400 amp service install. Filled out request form, engineer showed up, made his measurements and sent me the invoice. I trenched from service entrance to just adjacent to junction box, set conduit sweeps and gravel at transformer location, granted Inland an easement. Crew showed up about a week later hand dug to the main junction and dropped in service feed, transformer base and case, set meter and had me backfill trench then turned on the juice. Very good experience.
 
   / Local PUD/Electric Association New connection Issues #12  
Stuff like that is usually pretty simple around here too. There are just some places that have layers of rules, regulations, requirements and inspections.
 

Tractor & Equipment Auctions

2015 JEEP Compass (A50324)
2015 JEEP Compass...
2021 John Deere 9570R Articulated 4WD Tractor (A50657)
2021 John Deere...
2010 International 4400 National Crane 300C Crane Truck (A50323)
2010 International...
STIHL TS420 CUTQUICK SAW (A50854)
STIHL TS420...
2010 Cadillac CTS Performance Sedan (A48082)
2010 Cadillac CTS...
Wells Cargo 10ft S/A Enclosed Cargo Trailer (A48082)
Wells Cargo 10ft...
 
Top