Local PUD/Electric Association New connection Issues

   / Local PUD/Electric Association New connection Issues #11  
I had a very similar experience to Oosik when Inland Power did my 400 amp service install. Filled out request form, engineer showed up, made his measurements and sent me the invoice. I trenched from service entrance to just adjacent to junction box, set conduit sweeps and gravel at transformer location, granted Inland an easement. Crew showed up about a week later hand dug to the main junction and dropped in service feed, transformer base and case, set meter and had me backfill trench then turned on the juice. Very good experience.
 
   / Local PUD/Electric Association New connection Issues #12  
Stuff like that is usually pretty simple around here too. There are just some places that have layers of rules, regulations, requirements and inspections.
 

Tractor & Equipment Auctions

2018 JOHN DEERE 204L WHEEL LOADER (A51242)
2018 JOHN DEERE...
BUYERS PREMIUM & PAYMENT TERMS (A51219)
BUYERS PREMIUM &...
2016 New Holland B95CLR Loader Backhoe (A50860)
2016 New Holland...
2012 FREIGHTLINER CASCADIA (A50854)
2012 FREIGHTLINER...
Dozer Blade Attachment (A50860)
Dozer Blade...
2016 John Deere 6110M Utility Tractor (A50657)
2016 John Deere...
 
Top