Initial excavation for gravel road build... how deep?

   / Initial excavation for gravel road build... how deep? #21  
On my 800' driveway we took the 10-12" of loam off until hitting clay then put a foot or more of bank run down. Been driving on it for a couple of months and next month will top with 3/4 crushed. Held up great during some storms.
 

Tractor & Equipment Auctions

2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
UNUSED DIGGIT 72" HYD MULCHING HEAD (A54757)
UNUSED DIGGIT 72"...
2018 John Deere 470G LC Hydraulic Excavator (A53421)
2018 John Deere...
UNUSED FUTURE BS72B - 72" HYD BOX BROOM (A54757)
UNUSED FUTURE...
PAIR OF DIAMOND PLATE DOUBLE AXLE FENDERS (A54756)
PAIR OF DIAMOND...
KJ 7'x20' Metal Farm Driveway Gate (A53316)
KJ 7'x20' Metal...
 
Top