Initial excavation for gravel road build... how deep?

   / Initial excavation for gravel road build... how deep? #21  
On my 800' driveway we took the 10-12" of loam off until hitting clay then put a foot or more of bank run down. Been driving on it for a couple of months and next month will top with 3/4 crushed. Held up great during some storms.
 

Tractor & Equipment Auctions

JOHN DEERE 7210R TRACTOR (A51247)
JOHN DEERE 7210R...
2023 FORD F-150 PRO LIGHTNING CREW CAB TRUCK (A51406)
2023 FORD F-150...
FORD SUPER DUTY TAILGATE (A51406)
FORD SUPER DUTY...
2019 MACK PINNACLE P164T DAY CAB ROAD TRACTOR (A51406)
2019 MACK PINNACLE...
Sterling AT (A55301)
Sterling AT (A55301)
UNUSED FUTURE BS72B - 72" HYD BOX BROOM (A54757)
UNUSED FUTURE...
 
Top