How to ground my metal building.

   / How to ground my metal building. #21  
the panel in the shop has to have a main breaker, at least to meet code. i have no idea if your getting inspections.

the only way we get by not having a main breaker is if its a subpanel WITHIN the same structure. so a shop or outbuilding doesnt count.
 

Tractor & Equipment Auctions

2019 Cat D6 Dozer (RIDE AND DRIVE) (NEXT GEN) (A50775)
2019 Cat D6 Dozer...
Safety Basket (A53316)
Safety Basket (A53316)
2003 Chevy 2500 Pickup (RUNS) (TITLE) (A50775)
2003 Chevy 2500...
8' LARGE FENCE POSTS (APPROX. 20-25 PC) (A54757)
8' LARGE FENCE...
KJ 7'x20' Metal Farm Driveway Gate (A53316)
KJ 7'x20' Metal...
(APPROX 15) 2" X 6" X 20'- 3/8" THICK METAL TUBING (A54757)
(APPROX 15) 2" X...
 
Top