good morning mark,
good to see you posting, i know all is going well. /forums/images/graemlins/wink.gif /forums/images/graemlins/wink.gif
the roadway is what they call SB2 in this area, packs like concrete, they use it for oil field related service roads, $374 for 14 yds. it is about 4 inches thick up around the house and don't forget, there was already a 700' red iron ore road on the property when i bought it, this is just a continuation of that road. i will put more of the SB2 on the red road to cut the dust later /forums/images/graemlins/grin.gif /forums/images/graemlins/grin.gif /forums/images/graemlins/grin.gif
this week, hvac, start inside electrical, formica kitchen, and marble vanities /forums/images/graemlins/cool.gif /forums/images/graemlins/cool.gif /forums/images/graemlins/cool.gif
the plan is to be moving about oct 4-5-6.......
thank again for the heads up on the gear shift lever.....
"Miss Alma" take a bath real well.... /forums/images/graemlins/grin.gif /forums/images/graemlins/grin.gif /forums/images/graemlins/grin.gif
thanks a millon,
gary