Yes! The project manager decided to have the company that removed the RR tracks remove the log jamb. Reason is because the bridge piers required divers to inspect pier footings, so it made more sense for them to do it. They utilized a floating platform with outboard motor. Couple guys on platform used a combination of saws and gaffs to get the logs moving.

Luckily I am still doing some of the tree removal on land nearby, so alls not lost.
Did they complete the job already? if so, did you get to see any of the action to see what you missed?
IMO you dodged a bullet and if you get to do all their other jobs still A+
 
   / Got asked to bid a very unusual project #392  
I'm glad it worked out, and i think we all appreciate the update.

Now, for the "told you so" part; for people that doubted the seriousness of working around a bridge structure...
 

Tractor & Equipment Auctions

2022 Kobelco SK85CS-7 Excavator (A48837)
2022 Kobelco...
WHEEL LOADER BUCKET (A46683)
WHEEL LOADER...
2020 Dodge Ram 1500 4X4 (A50397)
2020 Dodge Ram...
2015 CASE CX210D EXCAVATOR (A50458)
2015 CASE CX210D...
Kopalift 2,000lbs Electric Walkie Stacker Forklift (A49346)
Kopalift 2,000lbs...
2008 Kubota M7040 (A47164)
2008 Kubota M7040...
 
Top