To20Chris
Platinum Member
I've been working all summer to do the grading around the riding ring. First I had to do some major water diversions, and then we had a guy with a dozer come in and level it out. He also rolled it out and dumped the fines in. As agreed, I was left with a large pile of topsoil to move. Unfortunately, he also changed the swale I put in in the feild behind, and so it no longer worked. A separate swale he installed along side also was not done right, so as a consequence, given the many heavy downpours we had this summer, the ring was heavily damaged about 4 times. I kept fixing the swales, and trying to get grass to grow, but every time the heavy rains would come and wipe it out before it could get established. I feel like I spent the whole summer doing the same projects over and over! I did, actually ! /forums/images/graemlins/mad.gif
Well, I finally got to moving "topsoil mountain", as we've been calling it. I used the FEL and my cheapo KK 5' BB. Both were flawless, as was the LK3054. After I had moved the soil around, I let it sit through a couple of rains to settle it, and then I had to go onto the bank with the BB. It was a bit nerve wracking, but I went slow and careful - no problems. I wish I had taken more pics along the way, but here is a shot of the pile about 50% gone:
Well, I finally got to moving "topsoil mountain", as we've been calling it. I used the FEL and my cheapo KK 5' BB. Both were flawless, as was the LK3054. After I had moved the soil around, I let it sit through a couple of rains to settle it, and then I had to go onto the bank with the BB. It was a bit nerve wracking, but I went slow and careful - no problems. I wish I had taken more pics along the way, but here is a shot of the pile about 50% gone: