I have my rebar tied and my forms are ready for concrete. I went with 3/8's rebar on a 12 inch grid for the wall and every two feet for the angle. The footing is 3 feet deep and a foot wide. The wall is two feet tall and changes from 18 inches thick right at the top of the cement pad, to 8 inches at the top.
Tomorrow I'm third in line for the concrete truck. The forecast is for rain and it's increasing. I'm hoping that I'll be fine, but if it's gonna be close.
I'm estimating 7 1/2 yards. I'm adding extrac cement to the mix to get a 4,000 psi mix.