Concrete pad estimates starting today.

   / Concrete pad estimates starting today. #1  

clovergamecock

Gold Member
Joined
Nov 16, 2006
Messages
268
Location
Clover SC
Tractor
Kubota L2800 4WD FEL
Hey guys. I have decided NOT to try and do this pad myself. I am wanting a 20x24 parking pad formed and poured on a flat surface that is pretty hard clay\dirt. It just needs to be a typical driveway style pad and not smoothed like a garage floor would be. Not looking at anthing special just a pad.

Any ideas on what a ball park extimate would be fo Clover SC which is about 20 minutes from Charlotte NC.

Thanks
Wade
 
   / Concrete pad estimates starting today. #2  
$200/yard for everything is about the going price

may be able to get less depending on level of finish you are shooting for.
 
   / Concrete pad estimates starting today.
  • Thread Starter
#3  
So roughly $1200 based on 20x24x4" thick? That would equal 5.93 cu. yds.
 
   / Concrete pad estimates starting today. #4  
So roughly $1200 based on 20x24x4" thick? That would equal 5.93 cu. yds.

That's about what I came up with. Buddy in Kingstree (concrete guy) helped us make sure our quotes out of Charleston were in line and those are the numbers he gave us.
 

Tractor & Equipment Auctions

2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
UNUSED LANDHONOR LHR-EPC40 PLASMA CUTTER (A54757)
UNUSED LANDHONOR...
CAT 973 Crawler Loader (A47477)
CAT 973 Crawler...
1840 (A51248)
1840 (A51248)
2012 Ford F-250 Pickup Truck (A52377)
2012 Ford F-250...
UNUSED RAYTREE RMA42 HYD AUGER (A54757)
UNUSED RAYTREE...
 
Top