After spending most of today changing one track and then replacing the bearings for my front wheels on the other track, I had a question...

how do you calculate the cost of down time? I know my daily fixed cost for equipment payments, insurance, etc...then the cost of parts and repairs but how do you factor is the lost production? Look at profit per hour x 8 hrs.?

just trying to get a handle on down time...

thanks-

TMTS
 
   / calculating cost of down time... #2  
Yes, normal profit * 8 hours. Plus repair costs outside of normal maintenance.

You may have to add extra costs if you have any time based contracts and have to rent equipment to keep on schedule.
 

Tractor & Equipment Auctions

SDLANCH MINI WALK BEHIND SDLL30 LOADER (A53843)
SDLANCH MINI WALK...
2025 SDLANCH IRGC40 UNUSED Electric Tricycle (A53117)
2025 SDLANCH...
Caterpillar 308E2 CR Mini Excavator (A52377)
Caterpillar 308E2...
Electric Mobility Scooter (A51694)
Electric Mobility...
2016 CATERPILLAR 336FL EXCAVATOR (A52705)
2016 CATERPILLAR...
2008 Ford F-450 14FT Flatbed Truck (A51692)
2008 Ford F-450...
 
Top