After spending most of today changing one track and then replacing the bearings for my front wheels on the other track, I had a question...

how do you calculate the cost of down time? I know my daily fixed cost for equipment payments, insurance, etc...then the cost of parts and repairs but how do you factor is the lost production? Look at profit per hour x 8 hrs.?

just trying to get a handle on down time...

thanks-

TMTS
 
   / calculating cost of down time... #2  
Yes, normal profit * 8 hours. Plus repair costs outside of normal maintenance.

You may have to add extra costs if you have any time based contracts and have to rent equipment to keep on schedule.
 

Tractor & Equipment Auctions

2010 CATERPILLAR D6N LGP DOZER (A51406)
2010 CATERPILLAR...
2016 FORD F250 XL SUPER DUTY EXTENDED CAB TRUCK (A51247)
2016 FORD F250 XL...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
378467 (A51572)
378467 (A51572)
2015 Skyjack SJ 4626 Scissor Lift (A53117)
2015 Skyjack SJ...
20 ft. Shipping Container (A53117)
20 ft. Shipping...
 
Top