I just pulled the trigger on a new 3025e and one of my first projects will be burying the wire for an invisible dog fence. I only need to get an inch or so of dirt on top of the wire.
Also, eventually I would like to run some additional 1 inch irrigation lines to feed a dripper system.
My best guess is that a subsoiler like this is my best bet:
3 Point Subsoiler-Subsoiler Attachment | Agri Supply #7341
Am I on the right track?
Also, eventually I would like to run some additional 1 inch irrigation lines to feed a dripper system.
My best guess is that a subsoiler like this is my best bet:
3 Point Subsoiler-Subsoiler Attachment | Agri Supply #7341
Am I on the right track?