BUilding a new road, culvert suggestions?

   / BUilding a new road, culvert suggestions? #61  
Most effective trash racks will be smooth pipe or tubing 4 to 6 inches apart with the lower ends on or in the dirt in the bottom of the ditch with the upper end higher then the culvert it is protecting, this is laid at a low angle to allow the trash to push up and over or off the rack.

Right on. The low angle is the key. You want the water to be able to push trash up the rack so the water flows under.
rScotty
 

Tractor & Equipment Auctions

2022 MACK GRANITE TANDEM AXLE DUMP TRUCK (A54607)
2022 MACK GRANITE...
J and L Cargo Express Shadowmaster Enclosed Trailer (A55301)
J and L Cargo...
2016 RAM 5500 Bucket Truck - Cummins Diesel - Auto Trans - 4X4 - Altec AT41M Boom (A55302)
2016 RAM 5500...
(INOP) 2022 JLG R3246 ELECTRIC SCISSOR LIFT (A54756)
(INOP) 2022 JLG...
PAIR OF UNUSED 60" HANG ON FORKS (A54757)
PAIR OF UNUSED 60"...
More info coming soon! (A53421)
More info coming...
 
Top