jimb1724
Silver Member
Hello All:
It's mud season in New Hampshire and I am seriously thinking about getting the top of my driveway blacktopped. It currently is soil with a heavy clay content which gets really messy this time of year, plus all year long dirt from shoes is constantly brought into the house... a real mess.
Anyway, I was thinking that I could do a lot of the site prep work myself, and I was hoping to get some input from those of you on this site that might have gone through the blacktop process before. The area to be done is about 35' wide and 60' long (2,100 sq/ft)... A picture of the area to done is attached.
So here are my questions:
what type of base material works best ? sand or screened dirt/gravel ?
how much of a base (depth) should be put down ?
since i am hoping to shape the parking area to direct water (rain/snow melt) should the base be level and shape the drainage with the blacktop ?or should I shape the base and just blacktop uniformly over it ?
any ideas as to the current cost per sq/ft of blacktop in the northeast ?
Any other thoughts and comments would certainly be appreciated as I have never approached a project like this before.
As always, thank you all for your input.
JIm
It's mud season in New Hampshire and I am seriously thinking about getting the top of my driveway blacktopped. It currently is soil with a heavy clay content which gets really messy this time of year, plus all year long dirt from shoes is constantly brought into the house... a real mess.
Anyway, I was thinking that I could do a lot of the site prep work myself, and I was hoping to get some input from those of you on this site that might have gone through the blacktop process before. The area to be done is about 35' wide and 60' long (2,100 sq/ft)... A picture of the area to done is attached.
So here are my questions:
what type of base material works best ? sand or screened dirt/gravel ?
how much of a base (depth) should be put down ?
since i am hoping to shape the parking area to direct water (rain/snow melt) should the base be level and shape the drainage with the blacktop ?or should I shape the base and just blacktop uniformly over it ?
any ideas as to the current cost per sq/ft of blacktop in the northeast ?
Any other thoughts and comments would certainly be appreciated as I have never approached a project like this before.
As always, thank you all for your input.
JIm
Attachments
Last edited: