Hi All,
I am building a road grader. It is a low (as possible) budget project.
I am not a machinist but have a lot of patience.
I have almost finished cutting all the steel pieces and will need to drill four
7/8" and two 3/4" holes in 3/8" material for the lift arms and top link pins.
It looks like two drill bits from McMaster_Carr will run me about $100 . Or I could just get the 7/8" bit and use a bushing on the 3/4" top link pin.
QUESTION:
My drill press has a 1/2 hp 1750 rmp motor. I get a 5:2 speed reduction
using my slow speed pully for 700 rpm. Can I drill a 7/8" hole with this??
Or is there a better (cheaper) way ?
Thanks.
I am building a road grader. It is a low (as possible) budget project.
I am not a machinist but have a lot of patience.
I have almost finished cutting all the steel pieces and will need to drill four
7/8" and two 3/4" holes in 3/8" material for the lift arms and top link pins.
It looks like two drill bits from McMaster_Carr will run me about $100 . Or I could just get the 7/8" bit and use a bushing on the 3/4" top link pin.
QUESTION:
My drill press has a 1/2 hp 1750 rmp motor. I get a 5:2 speed reduction
using my slow speed pully for 700 rpm. Can I drill a 7/8" hole with this??
Or is there a better (cheaper) way ?
Thanks.