I think "3 hours" is WAY overly optimistic, for an installation.
Time to assemble materials at the job site, time to dig for tank and field lines, time to assemble the pieces, time to add stone, time to backfill/cover, etc.
With you having ZERO experience, and zero equipment, I would suggest getting a second estimate, and then go with the lower of the two.
There’s close to zero chance even an experienced 2 guy crew with a full size backhoe or trackhoe is going to put one in in 3 hours. Its probably 1.5 days work with 2 guys and a full-size backhoe. One guy, no experience and too small of a backhoe better plan for a week.