We will be building a house over the next few months. I will be having to run 900' of waterline. The main utility line is a new 8"-10" and about 1/4 mile from one of the water towers. A residential meter is 3/4". Obviously getting to the end of a 900' line could lose a lot of pressure and volume. I'm thinking a 1.25" line collared down to the 3/4" at the meter should keep the pressure and volume at a decent rate. Would I be wrong in that assumption?