Add remote valve to L2900

   / Add remote valve to L2900 #1  

scokeing

New member
Joined
Apr 30, 2005
Messages
1
Location
Eads, TN
Tractor
Kubota L2900 GST
A newbie here with a question about hydraulics. Done a lot of searches on the subject here but want to be sure.

I have an L2900 GST with a front loader. I now have a pull gang reel mower with one hyd line that I need to add a remote connector and valve to the tractor. I priced the kit from Kubota and wow $800. Being a DIYer I think I can add this for less and have some fun doing it.

My oper manual shows the Hyd block outlet has 3 ports: (1) From implement, Inlet (2) To implement, Outlet (3) From Implement, Tank Port. All are commected to operate the Front loader.

I have read about the power beyond option and do not understand what it does in the system, just that it is required for this type of add to the system.

I have searched this site for help but still need help. If anyone could help with a flow diagram schmetic and explain how to "tap" into my current hyd system to add a valve and remotes.

Thanks to this site I have learned a lot about the mounting of valves and running lines along with the safety issues associated with hydraulics, that in itself is fantastic.

Thanks Scott
 
   / Add remote valve to L2900 #2  
You haven't searched well enough. /forums/images/graemlins/grin.gif /forums/images/graemlins/grin.gif

To add your own valve it must have power beyond capabilities, usually by just adding a sleeve into an outlet port.

To connect, you do as follows: <ul type="square"> [*]Disconnect the hose that is connected to the "from implement" port on the hydraulic block. This is the PB hose from the loader valve. [*]Take that hose and connect it to your aux valve's inlet port using a union fitting and another hose or just get a longer hose to go from the loader's PB outlet to your aux valve's inlet. [*]Run a hose from the PB outlet of your aux valve to the "from implement" port on the hydraulic block. [*]Finally, disconnect the hose from the hydraulic block "From implement tank port" and replace it with a Tee fitting. Reconnect the hose to one leg of the tee fitting and connect a hose from your aux valve's tank port to the other leg of the Tee fitting. [/list] You have just successfully connected your aux valve in series with the hydraulic circuit and are now all set to go.
 

Tractor & Equipment Auctions

2001 VOLVO A35D WATER TRUCK (A51242)
2001 VOLVO A35D...
48in Forks Loader Attachment (A49346)
48in Forks Loader...
2012 Ford F150 Crew Cab Pickup Truck (A50323)
2012 Ford F150...
2013 Nissan Sentra Passenger Car, VIN # 3N1AB7AP8DL772101 (A50324)
2013 Nissan Sentra...
2017 POLARIS RANGER 570 4X4 PROSTAR UTV (A51406)
2017 POLARIS...
2000 ADDCO DH1000 Message Board (A49461)
2000 ADDCO DH1000...
 
Top