re: abrogator? Post driver!#%@&
Sounds like you hook up with very shady type contractors. It is unfair to apply that label to all. Did you count the material/brick and block when it was delivered and compare it to the invoices or are these “hand shake” deals where you’re paying flat rate?
I wouldn't give free materials to a contractor ever. The stuff they steal from jobsites is insane (steal = saying job requires 42 4x4, use 38, keep the other 4 but charge customer for 42). Masons seem to be the worst at it in my area, you watch them load the block/brick and take it to the next job. Some bricks must have been paid for 10 times.
Sounds like you hook up with very shady type contractors. It is unfair to apply that label to all. Did you count the material/brick and block when it was delivered and compare it to the invoices or are these “hand shake” deals where you’re paying flat rate?