Digging a pond with backhoe... Need advice

   / Digging a pond with backhoe... Need advice #1  

futuresweets10

Silver Member
Joined
Jun 6, 2010
Messages
125
I started digging my pond this weekend with only a backhoe at my disposal. I am not doing any sort of dam, rather digging a big hole in the ground. I want a pond, but my other motivation is the amount of fill dirt I need else where on my property. I can dig for about 10 min and then have a rather large pile of dirt to be moved. It takes me about an hour to an hour and a half to move the pile of dirt that took me 10 min to make. Part of the problem is that the ground is soft and it you have to regrade the path that is driven on after every few passes hauling dirt. I have other people helping me and we have been taking turns on the machine. I was thinking about renting a second piece of equipment for a weekend (one day rental) so I dont have to stop digging. The front bucket on my hoe is a 1 yd . I was looking at a track loader (bob cat with either 1/2yd bucket or 3/4yd). The loader and a small (6yd) dump truck are the same price per day. Would I have better luck with a dump truck or a small track loader? I would think the truck would be easier to get stuck and we may even have to lay mats down but I would also think the truck would go a little quicker once we got set up.

Would you go with the loader, the truck, or something completely different? Thanks guys....
 
   / Digging a pond with backhoe... Need advice #2  
It usually comes down to a truck moves faster than a loader and becomes more efficient over longer distances. A loader has quicker cycle times moving dirt than loading and dumping a truck and is more efficient over short distances. I would consider whether you think you could load and dump a truck once, or move 12 bucket loads with the loader in a shorter time over the distance you are looking at. If the distances are short and the ground is soft it seems to me the track loader will win. Also, trying to dig out a badly stuck 6 yard truck could take a good chunk of your time.
 
   / Digging a pond with backhoe... Need advice #3  
My votes for a tracked loader or skid steer. If you're already getting stuck and there's that much mud the last thing you want is another set of tires. Especially a truck that's going to have duallies (sp?) they get stuck faster than anything in mud or snow.
 
   / Digging a pond with backhoe... Need advice #4  
You found the worst part of digging a pond "getting rid of the dirt". I would go with an excavator and {because of mud} some type of tracked dump??? If the BH is doing what you want then just get the tracked dump. If the dump is not an option then a TRACKED skid steer would be the next best. Allmost every person I've come across feels pond digging isn't so bad, but moving dirt can become a real nightmare fast.
 
   / Digging a pond with backhoe... Need advice #5  
You found the worst part of digging a pond "getting rid of the dirt". I would go with an excavator and {because of mud} some type of tracked dump??? If the BH is doing what you want then just get the tracked dump. If the dump is not an option then a TRACKED skid steer would be the next best. Allmost every person I've come across feels pond digging isn't so bad, but moving dirt can become a real nightmare fast.
I'll take it.
 
   / Digging a pond with backhoe... Need advice #6  
You didn't say how far you are moving the dirt. Moving it very far with a bucket is a slow process. Track loaders don't move real fast (those with dual speed move faster but still not as fast as a tractor).

You might consider just piling the dirt close to where you are digging until you get the pond done. My biggest concern would be rain filling the hole before you have it done.

If you pile it close to the pond, then you can get the pond done and move it at your leisure.

Ken
 
   / Digging a pond with backhoe... Need advice
  • Thread Starter
#7  
You didn't say how far you are moving the dirt. Moving it very far with a bucket is a slow process. Track loaders don't move real fast (those with dual speed move faster but still not as fast as a tractor).

You might consider just piling the dirt close to where you are digging until you get the pond done. My biggest concern would be rain filling the hole before you have it done.

If you pile it close to the pond, then you can get the pond done and move it at your leisure.

Ken

Pond is WAY to big to just dig and move dirt later, and there isnt really anywhere it could be temporarily put. I would have to say it is getting moved about 250-300ft. Water filling up the pond before it is done is unavoidable with the size of the pond. I have about 25-30hrs in it and I estimate about 1% of the dirt that is going to be moved is moved. Its going to get wet and im just going to have to let it dry out. A track loader cant be any slower than the back hoe at this point because we are having to go slow with the back hoe once its got a load on it.
 
   / Digging a pond with backhoe... Need advice #8  
Pond is WAY to big to just dig and move dirt later, and there isnt really anywhere it could be temporarily put. I would have to say it is getting moved about 250-300ft. Water filling up the pond before it is done is unavoidable with the size of the pond. I have about 25-30hrs in it and I estimate about 1% of the dirt that is going to be moved is moved. Its going to get wet and im just going to have to let it dry out. A track loader cant be any slower than the back hoe at this point because we are having to go slow with the back hoe once its got a load on it.

Wow! You have a major project there and I don't think you have the right equipment to do it, nor will a CTL be adequate.

You say you have 25-30 hours (3 days?) and are 1% complete? That means 300 days of work :confused2:

What if it doesn't dry out, but continues to fill?

Some years ago, we had a 100' dia pond dug by a contractor. He used a large track hoe (excavator) and two pans (earthmovers) to move and distribute the dirt.

Most ponds around here are done either with dozers or excavators, not backhoes or CTLs.

Ken
 
   / Digging a pond with backhoe... Need advice #9  
When I dug my 3/4 acre pond, I used my New Holland 2wd 555E to do all the work. I found that if I dug low areas and left a higher area in the pond for driving on, those higher areas dried out for me. I would back in along my roads, dig out into the low areas and pile the dirt on the road. Then when I had about ten yards, give or take, I would drive out and come back in front ways to get a load with the bucket and back out with it.

This worked fairly quickly at digging and removing the dirt, but with winter coming, I became panicked about the rains coming and started just dumping the dirt around the outside of hte pond. This really helped speed things up, and allowed me to keep digging until the rains shut me down. Fortunately I was done and just getting out as much extra as I could.

I spent a full year hauling off that dirt a little at a time. Not having it in there meant that I was in no rush to get it done.

I now have a 5 yard F600 dump truck. It's so much faster at moving dirt. I dig with the backhoe and load right into the bed. The real trick is to park the truck on dry ground.

I think the track loader or skid steer will be a waste of time and money. Tracks are better at getting aroudn in the mud, but not great. Nothing is great at dealing with mud and sometimes you just trade one problem for another that is a lot worse.

How big is this pond right now? How big will it be? How deep? What type of soil and who are you going to get water into it?

Eddie
 
   / Digging a pond with backhoe... Need advice #10  
It took me 3 years, but I dug my 1 1/2 acre pond 20' deep with steep sides except next to the dock for swimming. The steep sides have completely prevented any cattails or the likes from growing. According to the calculations, I have about a 7 1/2' average depth; which is relatively deep. It would have taken me 5 years if I didn't rent a long stick 40 ton excavator with a 2 yard bucket and keep 4 dump trucks running 12 hours a day for the last 5 days of digging.

I used my 955 Cat crawler and D6 to smooth out the dirt berm (not really a dam because it's just a big hole in the ground with natural springs). Once I got past about 10' deep the Cat and D6 were useless because I was spending more time and power just to get the machines back out than I was moving dirt. At about 20' deep the 'dirt' was pure gray clay. I mean pure gray, not even a hint of dirt in it. Talk about heavy!! I could only take about half a scoop with the excavator each bite and 3 of the 4 dump trucks couldn't dump a full load. Somewhere I have a picture of a tandem axle dump with the front tires about 8' off the ground. I used the Cat high lift to try to scrape the clay out of the bet and only succeeded in standing the dump on it's rear.

The driver in that truck, a brother in law, wouldn't get out until we sat it back down. I had to drive the excavator over behind the dump to scrape the clay out while I had my dad use my 955 Cat hold the front of the truck up until the bed was empty and then slowly lower it down. Such fun....not!

My trouble is that most of the 'pictures' are actually videos. Digital cameras were just starting to emerge then. I think Sony had a camera that would record pics on a 3 1/2" floppy disk, but that was about it.

Anyway, without having at least 1 dump truck, it will take you years if you're going to build a pond of any size. If it does take a while, no big deal, just pump it dry in late spring and start digging. The shocker will be that you'll have to constantly shut your pump off and clear the chewed up fish from the intake. Seriously! Each year I had fish that were 4" or 5" long in the water. Theories vary, but the most accepted theory is that geese and ducks eat fish eggs in other ponds, fly to my water hole, drop their poo with fish eggs in it that are still viable.

Get you a dump truck and good luck! I dug about a 1/4 acre pond for a friend earlier this year with my Takeuchi 145 mini excavator and his old Ford dump truck in one week of working afternoons until we couldn't see anymore. If he had 2 dump trucks running I could have dug it in half the time. It seemed like I was always waiting on him.
 
   / Digging a pond with backhoe... Need advice #11  
I think the track loader or skid steer will be a waste of time and money.

I no longer have my Cat 955, but I do have a 2007 Takeuchi TL150 with a 3/4 yard bucket on it. It's a beast for some things but would be the wrong tool for the OP. He needs to find an old dump truck like you have. I still wish I wouldn't have sold my '63 Chevy dump truck. It only had a 327ci engine in it, but it would back up hills to dump it's load where the larger diesel dumps would run out of power with a full load trying to back up the hills.
 
   / Digging a pond with backhoe... Need advice #12  
I'll take it.

I'm in the middle of dredging my large pond out, if you were closer I'd have PLENTY of blue clay and dirt for you :)

I have to agree, for what the OP is discribing a dump would be the best bet. I wonder if maybe a dump trailer might even be an option? As far as water in the pond goes, a pump would be WELL worth using to keep it as dry as possible. Moving dry/damp dirt is a big enough issue but moving slop could stop you dead in your tracks.
 
   / Digging a pond with backhoe... Need advice #13  
If you're going to be doing this for awhile (seems so) then you might consider buying your own dump, and reselling down the road. I'd do a cost comparison on buying vs renting. I just excavated several hundred yards of dirt for a new garage, and to rent my concrete sub's 5 yard dump was $50/hr. I recently bought a 1 ton dump for 7K, and have used it quite a bit already on that project with more to follow. I would have liked to get the bigger dump, but wanted the 4WD on the 1 ton to get around some slopes. You can buy the older 5 yard gasser dumps for around 4-5K.
As for moving the dirt, I'd recommend the biggest excavator you can afford to rent!
Good luck!
 
   / Digging a pond with backhoe... Need advice #14  
I've got a dump trailer. It's great for some things but its way too slow for moving that much dirt. Find an old dump truck. If you're just moving the dirt to another location on your own property you should be able to find a beater truck...or two real cheap. Here in IL the state auctions off their dump/plow trucks several times a year. Some of them go pretty cheap. They're usually tandems.

If you can keep the hole dry enough you can speed up the digging by using the loader instead of the hoe for digging. The trick is to use the weight of the machine to help dig....think digging down on a slope rather than digging level skinning off the top.
A track hoe would be much faster. Watch the equipment auctions. Equipment is going cheap these days.
A dragline would be even better than a track hoe if your pond is very big.
 
   / Digging a pond with backhoe... Need advice
  • Thread Starter
#15  
When I dug my 3/4 acre pond, I used my New Holland 2wd 555E to do all the work. I found that if I dug low areas and left a higher area in the pond for driving on, those higher areas dried out for me. I would back in along my roads, dig out into the low areas and pile the dirt on the road. Then when I had about ten yards, give or take, I would drive out and come back in front ways to get a load with the bucket and back out with it.

This worked fairly quickly at digging and removing the dirt, but with winter coming, I became panicked about the rains coming and started just dumping the dirt around the outside of hte pond. This really helped speed things up, and allowed me to keep digging until the rains shut me down. Fortunately I was done and just getting out as much extra as I could.

I spent a full year hauling off that dirt a little at a time. Not having it in there meant that I was in no rush to get it done.

I now have a 5 yard F600 dump truck. It's so much faster at moving dirt. I dig with the backhoe and load right into the bed. The real trick is to park the truck on dry ground.

I think the track loader or skid steer will be a waste of time and money. Tracks are better at getting aroudn in the mud, but not great. Nothing is great at dealing with mud and sometimes you just trade one problem for another that is a lot worse.

How big is this pond right now? How big will it be? How deep? What type of soil and who are you going to get water into it?

Eddie


I noticed alot of people telling me to rent an excavator... Thats not an option. You guys have talked me out of a track loader though. The doesnt have much done yet. Basically a small parimeter is done and ive started the insides of that part. I would say its going to be about 1/4 to 1/2 an acre when done. Im shooting for 7-10ft deep depending on the area. The soil is alot of clay, but I am far from a soil expert. A few times a year the area where the pond is going floods pretty bad, so I dont think filling it will be a problem.
 
   / Digging a pond with backhoe... Need advice #16  
That's allot of material to move. You'll be forever using a backhoe. Get the right equipment (track hoe or dragline and a couple of dump trucks) or you'll become discouraged over the lack of progress.
I've seen track hoes that still have a little life in them sell as for as little as $3500 at auction. I saw a dragline that needed some work (don't know how much) advertised for $5000 awhile back.
Eddie did an excellent write up about his pond. You should read it before you proceed.
 
   / Digging a pond with backhoe... Need advice
  • Thread Starter
#17  
That's allot of material to move. You'll be forever using a backhoe. Get the right equipment (track hoe or dragline and a couple of dump trucks) or you'll become discouraged over the lack of progress.
I've seen track hoes that still have a little life in them sell as for as little as $3500 at auction. I saw a dragline that needed some work (don't know how much) advertised for $5000 awhile back.
Eddie did an excellent write up about his pond. You should read it before you proceed.

If it takes me a year to dig it thats fine with me.....
 
   / Digging a pond with backhoe... Need advice #18  
Basically a small parimeter is done and ive started the insides of that part. I would say its going to be about 1/4 to 1/2 an acre when done. Im shooting for 7-10ft deep depending on the area.

Pictures would sure help, but if I understand correctly, you dug the perimiter and now you are trying to dig out the middle?

If it was me, and I was digging a pond with my backhoe, and I'm thinking about doing just that, I would either start at one end and work my way across, or start in the middle and work my way out. Either way, I would dig with the backhoe and load it into my dumptruck. I wouldn't even consider doing it any other way.

Good luck,
Eddie
 
   / Digging a pond with backhoe... Need advice #19  
I agree with Eddie, I would start in the middle digging as deep as I could go and work my way out, keeping the higher undisturbed ground to drive on. Watch out for cave ins too.:eek:
 
   / Digging a pond with backhoe... Need advice #20  
If the digging is going well with your hoe and you have help maybe find a good deal on used or rent a large tracked dumper since the ground is soft. That is the type of terrain those machines are made for. You could dig material while dumper is dumping and lode when it gets back.
 

Tractor & Equipment Auctions

excavator trenching bucket- one bucket per lot (A56438)
excavator...
2014 AMERITRAIL TUGGER TRAILER (A58214)
2014 AMERITRAIL...
2001 Workhorse Custom Chassis P42 Delivery Truck (A59230)
2001 Workhorse...
2024 Bobcat T86 (A60462)
2024 Bobcat T86...
2016 INTERNATIONAL PROSTAR TANDEM AXLE DAY CAB (A59904)
2016 INTERNATIONAL...
2019 TerraGator 7300 Spinner truck (A56438)
2019 TerraGator...
 
Top