thanks for the reply, I have watched many field fence installation video's but none show what i need to know, my fence will have three h-braces , one at the start of the fence. 2nd at 320' and last at 230' for a total of 550' so when i run the first roll from 0-320' and attach to the h-brace how do I attach the 2nd roll to the same h-brace to finish the last run out to the last h-brace ?