what to do before slab is poured for shop

   / what to do before slab is poured for shop #1  

bdog

Elite Member
Joined
Mar 26, 2004
Messages
2,628
Location
Texas
Tractor
John Deere 6130M
I am having a 50x50 shop being built. They have the forms set. I already put in the pipes for a future toilet and sink and ran a conduit for the lectrical coming in. Any thing else I should consider putting in before they pour the slab?
 
   / what to do before slab is poured for shop #2  
How about a drain in the floor if you are ever going to hose it out or for anything that might leak..also a pvc pipe maybe 2" going to the outside from wherever you envision ever wanting to run wires or anything to the outside.
 
   / what to do before slab is poured for shop #3  
Possibly a floor drain if you ever get the hankering for washing a vehicle inside. Sounds like you will have water in there so there is always the chance.
 
   / what to do before slab is poured for shop #4  
They sell pvc floor drains, I'd add one in the center plus make sure the door areas slope outward to shed rain, snow...it's anoying to have to keep a squeege around to clear the floor b/4 working on the equipment you just brought in from the rain...

I worked at the corner gas station as a teen and the first snow fall, bringing in everyone who needed snow tires & chains mounted had us pushing the squeege across the whole shop every time.
 
   / what to do before slab is poured for shop #5  
Are you planning to put a moisture barrier under the slab?
 
   / what to do before slab is poured for shop #6  
Consider installing the tubing needed for a heated floor. I understand that the tubing is not too expensive. Down the road you could add a boiler.
 
   / what to do before slab is poured for shop #7  
I agree, you need something to fight moisture. Plastic, gravel or both under the floor help a lot.
 
   / what to do before slab is poured for shop #8  
If you can get a car in then I would consider at least two drains, and also a conduit for other wires like a phone and network cables that you would not want with your electricity. I have a newly built 28x32 shop/garage and I sometimes wish I had thought of that before.
 
   / what to do before slab is poured for shop #9  
Hello
Don't forget to treat for termites.
Bill
 
   / what to do before slab is poured for shop #10  
hmmm let's see.........my ex-wife? :D:D:D
 

Tractor & Equipment Auctions

2004 MACK GRANITE CV713 DUMP TRUCK (A51406)
2004 MACK GRANITE...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
1992 Ford F-150 Pickup Truck, VIN # 1FTDF15Y3NNB06697 (A51572)
1992 Ford F-150...
2017 KENWORTH T4 CONCRETE MIXER TRUCK (A51243)
2017 KENWORTH T4...
2022 CHEVROLET 2500HD CREW CAB TRUCK (A51406)
2022 CHEVROLET...
FIRESTONE 9.5L-15 4 RIB TIRES (NEW CONDITION) (A55301)
FIRESTONE 9.5L-15...
 
Top