Rockgod and Piston, thanks for the encouragement on the grapple I purchased. I know in a few weeks, I will have a better feel for how this new implement performs. I've moved 85 Cu Yards of rock so far with the bucket. Now comes the Boulders. 3-4 of the boulders are very large, so I may end up skidding some in close to where I need them, then giving them a little curl/push with the bucket. Also, with this new equipment, the two piles of logs and brush, that have taken about 1/2 an acre away from my planted field can be moved quickly, after I cut the log sizes down.
I did have my dealer install the 3rd function kit. I just do not have the time, with work, and the projects that need to be finished. It was not cheap, but the work looks very good. (I'll post some pics of their work) Thanks again for you guys on this forum. I originally only had a drawbar and clevis between my 3pt arms, to claim as my implements. This forum helped me correctly choose those implements I now own, which have increased my ability to finish projects faster, correctly, and safer.