I'm on the same boat. Gate is 3000' from the house. There's a booster pump on a separate meter that is only about 1500' to the gate. Had a culvert under the driveway replaced and the track hoe operator forgot about the waterline. The good news is that there is a 2-2-2 direct bury cable laid above the water line. Repaired the cable and 2" waterline. Waterline/meter is at the gate. I plan to dig around the pump house and water meter to find the ends of the cable and see of i can use it to run 240V + neutral to the gate area from the pump house disconnect box. Don't need much current to run the battery charger and a couple LED lights. Gate is currently on solar + batteries.

Also want to add a heat tape to the backflow preventer that is at the meter. Almost froze last night with the 8° low. Letting the faucet after the BP drip until it warms up in a few days.
 
   / using sub soiler to bury direct burial wire #12  
Have some 10/2 direct bury still in service after 50 years. Nearly twice the size of the current 10/2/G now. Try to put all cable in conduit now. Trenchers are pretty cheap, fast and copper replacement is expensive. Not the time to be penny wise and a dollar foolish. Running extra conduit with pull tape might help future needs.

ATT subcontractor cleared a mule tape knot in the last 550’ conduit section of 2600’ run to the house for fiber yesterday Been a fluster buck of union vs nonunion and the 2” conduit was already installed 15 years ago.
 
   / using sub soiler to bury direct burial wire
  • Thread Starter
#13  
   / using sub soiler to bury direct burial wire #14  
Im looking at running a electrical wire 2,000 down a driveway( long I know) to operate gate, lighting and cameras. I believe direct burial cable is to be buried 24". Can a subsoiler trench this depth/ do this task.? if so what are the options of manufacturers. Anyone done this before?
Go rent a trencher. The money will be spent, you will get the job done without a lot of hassle and be happier down the line for your wise decision!!!!!
 
   / using sub soiler to bury direct burial wire #15  
my gate is only 900 ft. from house and I installed solar with a deep cycle battery, I still charge the battery about once every three months it would be less but we don't want to cut more trees for more sun light to get in. I also modified a subsoiler for direct bury and to lay pex water line works well but it will not reach 24 inches.
 
 

Tractor & Equipment Auctions

Set of Ag R4 Wheels and Tires (A52128)
Set of Ag R4...
2014 UTILITY 53X102 DRY VAN TRAILER (A51222)
2014 UTILITY...
2018 PETERBILT 579 TANDEM AXLE SLEEPER (A51222)
2018 PETERBILT 579...
TMA (A49461)
TMA (A49461)
CATALOG IS A GUIDE ONLY!! (A50775)
CATALOG IS A GUIDE...
2016 Ford Explorer AWD SUV (A50324)
2016 Ford Explorer...
 
Top