Starting my 40'x60' Pole Barn

   / Starting my 40'x60' Pole Barn #1  

captjohn

New member
Joined
Jan 31, 2014
Messages
24
Location
Bay St. Louis, MS USA
Tractor
Kubota 2550 4WD w/Front End Loader
Starting my 40x60 pole barn. 2-14'x14' roll ups in front, 1-12'x12' roll up on side, 2-3' entry doors and 5 windows. Adding a 12'x24' lean to over the container and a 6'x12' porch over main entry door.
6x6 posts 42"x18" in the ground w/rebar crossed on concrete cookies and filled with concrete.
Forming to pour 3500# w/fiber concrete with footings to natural ground.
I'll post more when it happens. Can't wait! :thumbsup:
 

Attachments

  • 2014-03-13 11.47.02.jpg
    2014-03-13 11.47.02.jpg
    649.6 KB · Views: 22,877
  • 2014-03-13 14.14.36.jpg
    2014-03-13 14.14.36.jpg
    1 MB · Views: 2,472
  • 2014-03-14 15.02.04.jpg
    2014-03-14 15.02.04.jpg
    1 MB · Views: 1,653
  • 2014-03-20 08.18.10.jpg
    2014-03-20 08.18.10.jpg
    1 MB · Views: 5,447
  • 2014-03-21 11.31.23.jpg
    2014-03-21 11.31.23.jpg
    1 MB · Views: 3,041
  • 2014-03-22 16.53.59.jpg
    2014-03-22 16.53.59.jpg
    1 MB · Views: 2,460
   / Starting my 40'x60' Pole Barn #2  
I think those posts will survive a tornado and nuclear blast the way you're anchoring them down! Good job.

I had to get engineering done for my pole barn footings, and they said the weakest point would have been backfilling the holes with soil (spoils from drilling) as it would never be able to resist side wind loading and would have let the poles fall over even before uplift was an issue. So we're completely filling the post holes with concrete too, albeit dry mix.

How much fill did you have to bring in? I just got done compacting 24 tons for my barn, but it looks like you had a *lot* more. That orange compactable fill is interesting stuff. Stains everything....
 
   / Starting my 40'x60' Pole Barn
  • Thread Starter
#3  
I think those posts will survive a tornado and nuclear blast the way you're anchoring them down! Good job.

I had to get engineering done for my pole barn footings, and they said the weakest point would have been backfilling the holes with soil (spoils from drilling) as it would never be able to resist side wind loading and would have let the poles fall over even before uplift was an issue. So we're completely filling the post holes with concrete too, albeit dry mix.

How much fill did you have to bring in? I just got done compacting 24 tons for my barn, but it looks like you had a *lot* more. That orange compactable fill is interesting stuff. Stains everything....

I live near the MS coast so I have to build to hurricane codes. I had an engineered drawing of the post footings to build to from the code office. Top double band will be bolted, all girts and perlins will be screwed and trusses will be strapped. We poured 7yds of concrete to fill the holes. So far I've had 294 yds. of fill brought in. The contractor still has to dig the footings out so I hope that will do the ramps, etc... :confused3: Yes, the red sandy clay is messy but it's what we use down here for foundations and road beds. I mucked about 20 yds. of top soil from the foundation to cover any red dirt that's exposed. :thumbsup:
 
Last edited:
   / Starting my 40'x60' Pole Barn
  • Thread Starter
#4  
I think those posts will survive a tornado and nuclear blast the way you're anchoring them down! Good job.

The container is a storm shelter. It'll have 6 more posts just like the building on the sides with beams bolted across the top then the lean to over that. We don't have tornadoes like further north so it's the best I'm doing to do for a hurricane shelter. It'll have a genny, a/c, tv and a bathroom.
 
   / Starting my 40'x60' Pole Barn #5  
Wow capt! Greetings from a bit north of ye up in Columbus. A question: ok, I see ye filled the inside with fill dirt up against what I reckon is a form? I don't understand that (heheheeee, I don't know much!), but I thought ye concrete had to go down into the ground about a foot or 18" like a foundation footing. So, if ye pour concrete on top of the fill now, seems to me like it's going to be kind of floating on top of the fill. What's to keep crits from tunneling under the concrete? Hep me, hep me understand.

And, if a man don't like to see a pole barn, etc., going up, the old boy ain't right.
 
   / Starting my 40'x60' Pole Barn
  • Thread Starter
#6  
Wow capt! Greetings from a bit north of ye up in Columbus. A question: ok, I see ye filled the inside with fill dirt up against what I reckon is a form? I don't understand that (heheheeee, I don't know much!), but I thought ye concrete had to go down into the ground about a foot or 18" like a foundation footing. So, if ye pour concrete on top of the fill now, seems to me like it's going to be kind of floating on top of the fill. What's to keep crits from tunneling under the concrete? Hep me, hep me understand.

And, if a man don't like to see a pole barn, etc., going up, the old boy ain't right.

The contractor has to dig the footings out 18" wide to natural ground all around the sides of the forms so concrete can fill it. When it's finished, you'll see a concrete wall all the way to the ground on all sides. No fill washes out this way. You'll be able to see the outsides of the posts this way but I can live with it. We're also putting 18" rebar pins in the posts 3" from the top of the concrete slab to tie the post to the slab at the top. The slab in the back is 4' above natural ground.
 
   / Starting my 40'x60' Pole Barn #7  
Interesting way to build a barn. Especially digging out the footings that way. Why didn't he just build forms and pour, then fill with dirt? Even with a small excavator, there is going to be a lot of hand digging and cleaning before climbing into the holes to tie rebar.

Did you compare this method to going with a metal frame building on a slab or stick built on a slab?

I like the posts. Was the size of the hole also part of the engineers design?

You are doing all sorts of new things. I like it!!!

Eddie
 
   / Starting my 40'x60' Pole Barn
  • Thread Starter
#8  
He said he was hand digging the footings and he's done many this way. He has a pretty big crew. They're non load bearing walls so only fiber concrete everywhere and only getting rebar at the roll up doors. I think the concrete will hold the fill in place. We've compacted it and let it sit for 1 month. I have 3 fiber only concrete slabs at my home over 10 years old and are holding up as well as the ones with steel in them.
Red iron steel buildings were $20,000+ more and I don't think I could stick build a 15' eave height building for $15 a sq. ft.
Hole size was on the county code office drawing for the post. We added 1 more rebar because the bottom 4 were 4" too short so the inspector made the change and cut us some slack.
 
   / Starting my 40'x60' Pole Barn #9  
So capt, they dig out from INSIDE ye forms? By hand? Man, I would have NEVER thought of doing that. And, they have to dig down 18" below the original land, right?
 
   / Starting my 40'x60' Pole Barn
  • Thread Starter
#10  
So capt, they dig out from INSIDE ye forms? By hand? Man, I would have NEVER thought of doing that. And, they have to dig down 18" below the original land, right?

Yes, inside the form. Not below natural ground, just down to it. This is only to keep the fill from washing out from under the slab. It's not load bearing. Picture a block wall with posts in it filled with dirt.
 

Tractor & Equipment Auctions

AGT QK16R Mini Excavator (A44501)
AGT QK16R Mini...
Bush Hog Triple Deck Pull-Behind Bat Wing Mower (A44571)
Bush Hog Triple...
2010 Ford F-150 Ext. Cab Pickup Truck (A42744)
2010 Ford F-150...
24in Tractor Backhoe Bucket BT4555 (A44789)
24in Tractor...
2013 PETERBILT 367 DAYCAB (A45333)
2013 PETERBILT 367...
2013 KENWORTH T800 MID-ROOF SLEEPER (A45333)
2013 KENWORTH T800...
 
Top