Spreding Sand - newbie needs help!

   / Spreding Sand - newbie needs help! #31  
I just did my building foundation base, and here was my routine with the end loader. Dump a load of base, back drag it. Get the next load, and use it's weight in the bucket to back drag the previous section to a finished state. Do a moving (backing) dump in the next section, and go for the next load, which I again use to back drag the one I just dumped. I repeated that routine for a couple of hours and was done with a couple thousand square feet in a remarkably short time.

The biggest help, however, was having a laser receiver clamped on to the loader arm to achieve the desired level. Used in conjunction with a rotary laser, and at a "known" amount of bucket curl during backdragging, I was able to achieve a finished floor height in one round. I did splurge and spend a couple of hundred on a magnetic mount receiver to stick on my boom, but I could have used the "stick" receiver that came with my laser level without much hardship.
 
   / Spreding Sand - newbie needs help! #32  
I just did my building foundation base, and here was my routine with the end loader. Dump a load of base, back drag it. Get the next load, and use it's weight in the bucket to back drag the previous section to a finished state. Do a moving (backing) dump in the next section, and go for the next load, which I again use to back drag the one I just dumped. I repeated that routine for a couple of hours and was done with a couple thousand square feet in a remarkably short time.

The biggest help, however, was having a laser receiver clamped on to the loader arm to achieve the desired level. Used in conjunction with a rotary laser, and at a "known" amount of bucket curl during backdragging, I was able to achieve a finished floor height in one round. I did splurge and spend a couple of hundred on a magnetic mount receiver to stick on my boom, but I could have used the "stick" receiver that came with my laser level without much hardship.

That is similar to what I do except I use a laser receiver on the box blade to smooth and level most jobs.
 
   / Spreding Sand - newbie needs help! #33  
We cheated when we put in our 135' X 250' outdoor ring a few years ago...we had a contractor do it all. The base was leveled and prepared with loaders, dump trucks and a big, vibrating dozer. The footing is something like quarter-minus or coarse sand (with the fines washed out). After it was all spread, leveled and fenced in, I bought one of these to do periodic grooming: Track & Ring Conditioner - System Fencing
Mine is th 8' wide 3-PH one (without guide wheels) and it does a really good job as long as I don't snag a fence post or rip up a jump standard.
The surface has held up to use and winter really well. Sadly, winters here can be hard on the fence and repair has become a routine spring chore for me:
2015fenceNside.jpg
 
   / Spreding Sand - newbie needs help!
  • Thread Starter
#34  
We cheated when we put in our 135' X 250' outdoor ring a few years ago...we had a contractor do it all. The base was leveled and prepared with loaders, dump trucks and a big, vibrating dozer. The footing is something like quarter-minus or coarse sand (with the fines washed out). After it was all spread, leveled and fenced in, I bought one of these to do periodic grooming: Track & Ring Conditioner - System Fencing
Mine is th 8' wide 3-PH one (without guide wheels) and it does a really good job as long as I don't snag a fence post or rip up a jump standard.
The surface has held up to use and winter really well. Sadly, winters here can be hard on the fence and repair has become a routine spring chore for me:
View attachment 485540

I'd love to have a contractor do it all, but I do not have the $$ for that. This will be an indoor and it is 60x140. I think the back drag with the bucket is the way to go. A string will be a nice guide to make sure I am about level. The base was done by an excavating contractor. It will need a bit of smoothing once the building is built, but remains still very level.

They had the laser level going with a light on the dozer doing the finishing work. Another dozer and a skid steer with a bucket keeping the finishing dozer supplied with dirt and moving any rocks uncovered out of his way.

It was pretty neat to watch actually.
 

Tractor & Equipment Auctions

2019 CATERPILLAR D6K2 LGP CRAWLER DOZER (A51242)
2019 CATERPILLAR...
Quick Attach Pallet Forks (A47384)
Quick Attach...
2009 FREIGHTLINER CASCADIA SLEEPER (A51222)
2009 FREIGHTLINER...
2020 CATERPILLAR 308CR EXCAVATOR (A51242)
2020 CATERPILLAR...
Neckover GL24-2-7K Gooseneck Trailer  24ft Deck, Dual 7K Axles, 14K GVWR (A52128)
Neckover GL24-2-7K...
2001 VOLVO A35D WATER TRUCK (A51242)
2001 VOLVO A35D...
 
Top