/pine
Super Star Member
- Joined
- Mar 4, 2009
- Messages
- 15,763
If you use a hiller/bedder (tool bar type) after tilling...you can add a couple of sweep cultivators that are set to trail the rear tire tracks...Actually, she did about a 1/4 acre with a tiller attachment on a weedeater and hand tools before met.
Covering the tire tracks is part of my concern with a 3pt tiller. I really do not want to shell out the amount of cash needed for a 7 foot tiller. Oof. Maybe I should look into renting one for the initial ground breaking or hiring it out and then a walk behind from there out.