I have not even caught up to the real work yet... My pictures are still on my phone and I need to download them. I have other things I must accomplish today but what's coming is...
Tomorrow we pour the footers for the foundation of a 28 x 28 large 2 car garage shop with a new master suite above. The stairs to basement have been opened up and made beautiful, the old cabinets are being configured in the basement to create an Irish Pub with 9' pool table, we are making an engineered beam & adding a window. the Utility laundry room is basically done (new relocated HVAC & Hot Water, sink and mix of old new cabinets & door. the Hot Tub wiring gets run in the next week or so, as well as the electrical for the new meter & panel to existing panel in basement. The pool got completely refurbed and added heater & new concrete apron, the kitchen got 2 feet bigger completely remodeled, the dining room is not home office, old HVAC got relocated to the attic, Garden room became part of the house. doors get moved and reused, divided the living room into a TV room & and a Mud Room entry from garage with huge coat closet. front door replaced... When I am done, the entire house will have been touched, at minimum the closet redone & paint in two of the bedrooms. I've got tons of pictures and yes, been busy... I promise I will keep updating & not disappear...
Be well all-o-y'all
David