Working rail roads and their tracks.

   / Working rail roads and their tracks. #2,821  
If there is a Whistle post they should be blowing....
 
   / Working rail roads and their tracks. #2,822  
If there is a Whistle post they should be blowing....
I've mentioned this before... when I was a little kid I could only find railroad tracks the traveled West or NorthWest. Couldn't figure out why there were no other directional signs....
 
   / Working rail roads and their tracks. #2,824  
Five minutes of coal hoppers loading/unloading in HO scale. Cars begin loading at 1:15. At 3:00 they begin to unload. (Note fishing swivels used to connect a three car consist on the layout vs Kadee or NMRA couplers.)

 
   / Working rail roads and their tracks. #2,825  
If there is a Whistle post they should be blowing....

I have a whistle post in my shop.
Learned to appreciate how large & heavy those were when I needed to move it.
 
   / Working rail roads and their tracks. #2,826  
Here's a railroad mystery just now unfolding. Thirty tons of ammonium nitrate vanished between manufacture at the Dyno plant in Cheyenne ("a global manufacturer of explosives", mostly for mining) and the destination, a remote rail siding in the Mohave Desert.

Latest update claims the seals on the railcar were intact before it was shunted into that 3-mile siding. No leaked material has been found anywhere.

This writeup emphasizes conspiracy thinking. Only 2.5 tons was needed for the OKC bombing. A simpler explanation is it was stolen for ag fertilizer.

Investigation is underway. It will be interesting to read why it was ordered delivered to such a remote location

 
   / Working rail roads and their tracks. #2,827  
Here’s the whistle post in my shop

1684700678838.jpeg
 
   / Working rail roads and their tracks. #2,828  
The picture that was with that post shows bags, but then infers the load may have been in a hopper car. Big difference if it was stolen of just leaked out.
 
   / Working rail roads and their tracks.
  • Thread Starter
#2,829  
Duluth, Missabe& Iron Range Railway Locomotive: 2-8-8-4

The Duluth, Missabe & Iron Range Railway hauled iron ore in Minnnesota, Iron ore is heavy and the DM&IR operated long trains of ore cars, requiring maximum power. These locomotives were based upon ten 2-8-8-4s that Baldwin had built in the 1930s for the Western Pacific Railroad. The need for a larger, coal-burning firebox and a longer, all-weather cab led to the use of a four-wheel trailing truck, giving them the "Yellowstone" wheel arrangement. They were the most powerful Yellowstonesbuilt, producing traction.
348281290_241609935138782_8836651369410007897_n.jpg
 

Tractor & Equipment Auctions

UNUSED PALADIN SKID STEER HYDRAULIC BREAKING HAMMER (A51243)
UNUSED PALADIN...
2011 Manac 36245B30 45FT T/A Walking Floor Trailer (A50323)
2011 Manac...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
2013 Ford F-550 4x4 Ext. Cab Auto Crane 6406H 6,400LB 3 Ton Mechanics Crane Service Truck (A50323)
2013 Ford F-550...
New 4-17.5 Forerunner Skidloader Tires (A50774)
New 4-17.5...
2004 Capacity Yard Spotter Truck - Cummins Diesel, Allison Auto, Low Hours (A52748)
2004 Capacity Yard...
 
Top