New WorkShop

   / New WorkShop #1  

warburtonplayer

Silver Member
Joined
Jun 9, 2007
Messages
127
I just wanted to get some thoughts about my new building. I plan on setting 6 6x6's for a 16x16 shop. Once the post are set I was just going to frame up the bottom of the post with 2x6's and poor concrete for the floor. Has anyone had any experience doing it this way? I have ordered the trusses which only cost $413 not too bad. I will frame up the top of the 6x6's with 2x6's and notch the top of the post and bolt the 2x6's up. If anyone has any ideas please let me know.
 
   / New WorkShop #2  
I am not sure on that. Hopefully others will chime in. But please keep us posted, pics too please.

:)
 
   / New WorkShop
  • Thread Starter
#3  
Forgot to mention that I will be using treated post with tar on the end of them.
 
   / New WorkShop #4  
6-6x6 is not enough if 8' centers.Would take 9 unless you have 16' door.
you might use treated on bottom 2x6.I also poured my floor after it was framed.Double 2x6 on top is probably OK. 2x8 better.Good luck on your shop.Framer
 

Tractor & Equipment Auctions

Mohawk 12,000lb Two-Post Electric Auto Lift (A51691)
Mohawk 12,000lb...
Utility Trailer (A52377)
Utility Trailer...
2004 Hydraulic Breaker Excavator Attachment (A52377)
2004 Hydraulic...
2005 TerraGator 8104 (A55301)
2005 TerraGator...
2015 CHEVROLET SILVERADO CREW CAB TRUCK (A51406)
2015 CHEVROLET...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
 
Top