YardBikeBob
Silver Member
I have a concrete project on the to-do list so I was considering building a 3-pt ballast with any left over mix.
Now I'm wondering just how much ballast I should be shooting for.
Went back to Operator's Manual to find weight information:
So I guess I don't need the concrete after all.

That ought to do it!
Bob
Now I'm wondering just how much ballast I should be shooting for.
Went back to Operator's Manual to find weight information:
| Weight | Notes | |
| LS R4041H | 3,615 | |
| LL4101 Loader | 1,100 | |
| 72" Bucket | 300 | Estimated |
| Operator | 250 | ditto |
| Subtotal: Empty Weight | 5,265 | |
| GVWR | 6,631 | Op Manual pg 4-18 |
| Available Payload | 1,366 | |
| 1/2 yd of Gravel | 1,350 | Bucket Capacity 15 cf |
| Remaining load for Ballast | 16 |
So I guess I don't need the concrete after all.

That ought to do it!
Bob