H20Buffalo4Sale
New member
- Joined
- Jan 28, 2004
- Messages
- 23
- Location
- 41 acres near Houston, TX, US
- Tractor
- Looking for 1st tractor
Howdy from Texas,
I am trying to buy some raw land that is in the flood plain & I need to figure some cost to raise from dirt on site/create a pond. This is to figure in with my loan application to buy the property.
I will need to make a driveway. I am thinking 14 feet wide on the driving surface, 4 feet high, & 350 feet long. I want to surface it with 6 inches of concrete wash out & I already have all of the info I need for that (I think). At the end of that driveway I want to build a dirt house pad that is 50 x 100 & 6 feet high to put a manufactured home on supported by cinder blocks or piers. The driveway has already been cleared & the 4 or 5 trees that are where the house pad would go are not more than 1 foot in diameter.
All I have to work with is a small tractor with a box attachment for grading, a John Deere 450 dozer, & about 6 months to get it done. I have learned how to operate the tractor, but I still need to learn how to operate the dozer.
A water well report states the following: 0-14ft=topsoil, 14-25ft=clay, 25-35ft=s&/clay streak... no way I'm digging any deeper. Can a JD450 easily topple 1 foot diameter tress in relatively loose soil? Any idea of a range of how much diesel fuel I should budget for? Any idea how much it might cost to have the 15,000 pound dozer hauled about 40 miles? Other expenses or information that I should consider? /forums/images/graemlins/confused.gif
Thanks,
Michael | JD450@RemoveThisCrapTheClays.com (remove "RemoveThisCrap" to e-mail me) | http://www.WaterBuffaloes.com/
I am trying to buy some raw land that is in the flood plain & I need to figure some cost to raise from dirt on site/create a pond. This is to figure in with my loan application to buy the property.
I will need to make a driveway. I am thinking 14 feet wide on the driving surface, 4 feet high, & 350 feet long. I want to surface it with 6 inches of concrete wash out & I already have all of the info I need for that (I think). At the end of that driveway I want to build a dirt house pad that is 50 x 100 & 6 feet high to put a manufactured home on supported by cinder blocks or piers. The driveway has already been cleared & the 4 or 5 trees that are where the house pad would go are not more than 1 foot in diameter.
All I have to work with is a small tractor with a box attachment for grading, a John Deere 450 dozer, & about 6 months to get it done. I have learned how to operate the tractor, but I still need to learn how to operate the dozer.
A water well report states the following: 0-14ft=topsoil, 14-25ft=clay, 25-35ft=s&/clay streak... no way I'm digging any deeper. Can a JD450 easily topple 1 foot diameter tress in relatively loose soil? Any idea of a range of how much diesel fuel I should budget for? Any idea how much it might cost to have the 15,000 pound dozer hauled about 40 miles? Other expenses or information that I should consider? /forums/images/graemlins/confused.gif
Thanks,
Michael | JD450@RemoveThisCrapTheClays.com (remove "RemoveThisCrap" to e-mail me) | http://www.WaterBuffaloes.com/