how to set up a road/path

/ how to set up a road/path #1  

ning

Elite Member
Joined
Mar 30, 2017
Messages
4,352
Location
Northern California
Tractor
Branson 3520h
For a long time there's been a de facto path down this hill from the house through the new arbors (the path has been in use for 30 years, the arbors are new this summer).

I take the tractor up or down a couple times a week; less often a lawn tractor, and there's some foot traffic.

Currently there's patchy vegetation over red clay. It's very dry here six months a year, and we get fairly wet in the winter.

I'm considering the best way to make it a more official and somewhat better functioning pathway; something smoother and better traction in the winter.

A major consideration is to make sure I don't increase erosion - there's surprisingly none showing but then I haven't cut into the ground there either.

I have a back blade that I'll likely use to make a hopefully consistent smooth path. The main question is what to put on it afterwards - and how to keep it there? I could see a thin layer of 3/4" that would embed itself in the clay surface, but it seems that given the slope much more would likely end up at the bottom of the hill.

Note that only the very surface of the clay on the hill gets at all soft when wet; the tractor has never made ruts though the tires sometimes slip a bit it it's really wet.
PXL_20230625_001057090.jpg
 
/ how to set up a road/path #2  
I had a load of 3/4 wash away on a slight grade (3%) over a coupe of winters. Then used 1 1/4 minus and it had been stable for decades.

Your dirt, grade, and rain are different, but larger rock will still be harder to wash away.

Bruce
 
/ how to set up a road/path #3  
You didn't mention the slope, but the photo did not look very steep. I would use your back blade to get a rough crown and swales to keep running / standing water off of the path. A gravel mix that is 3/4"- or 1/2" minus will pack and embed in the clay. I have driveway done with 1/4"- on top of clay that has held up well for fifteen years, though is now I need of a refresh. If you want to get fancy, put a geotextile down first, add your gravel and then compact it. Compaction adds a great deal to the durability.

If you put sorted gravel e.g. 3/4-1" down, it won't pack as well, and tends to roll underfoot.

Good luck!

All the best,

Peter
 

Marketplace Items

2000 Bobcat 863 High Flow Compact Wheel Loader Skid Steer (A59228)
2000 Bobcat 863...
2019 Chevrolet Silverado 2500HD Crew Cab Pickup Truck with Liftgate (A61573)
2019 Chevrolet...
2014 Grand Caravan (A62679)
2014 Grand Caravan...
2020 CATER PILLAR D6 LGP HIGH TRACK CRAWLER DOZER (A65053)
2020 CATER PILLAR...
2005 JLG 2646E2 26ft Electric Scissor Lift (A61572)
2005 JLG 2646E2...
BALDER INDUSTRIAL 20 HP MOTOR (A64281)
BALDER INDUSTRIAL...
 
Top