I'm not sure how to connect the various hoses from the pump to the new third function valve, the existing loader and new
grapple.
Any help would be appreciated.the
The cheap and simple way is to add a hydraulic selector valve assembly to the frame area of your loader close to the bucket.
Your local hydraulics place will be able to get you one and the right hoses and fittings.
The selector valve locks the bucket in place and directs the hydraulic flow to the
grapple cylinder.
Think of it like an A-B switch. You can use A (the bucket) or B (the
grapple) but not both at the same time.
You connect the two hoses going to the bucket cylinders to the selector valve. Then you connect the bucket cylinder hoses to the selector valve and the
grapple hoses to the selector valve.
Some 12 volt wiring back to the operator's station and you can instantly change from controlling the bucket to controlling the
grapple. When you are controlling one function, the other remains locked where you last left it.
There are lots more complicated ways to do this but for someone with limited knowledge of hydraulics, not a good idea as with hydraulics, you do NOT have the
lets just try it and see what happens option.
Instead you end up breaking expensive parts in a second.
Dave
M7040