HARVEST 06'

/ HARVEST 06'
  • Thread Starter
#11  
Scott VT,
The silage is pushed into a 3 walled pit and is packed tightly. At the open end the pile will be about 20' high. It is hard to tell but the 4wd with dozer blade is making the pile. By the way what is a gig rig I have never heard the term?
Deaf,
The farm sit's about a mile south of rt 40. I know the road's you speak of well I have traveled many a mile on them road's It is not my or my families farm I worked there full time in high school and for a few year's after and now work there in the A.M. to help them out.
 
/ HARVEST 06' #12  
Club Car Man, I can not attach pics in a PM either. The button just doesn't work for me.

WhyNot, I think he meant Big Rig
 

Marketplace Items

40' High Cube Multi-Door Shipping Container (A60463)
40' High Cube...
Iranch Portable Restroom (A60463)
Iranch Portable...
2018 FREIGHTLINER M2 4X2 26FT NON CDL BOX TRUCK (A59906)
2018 FREIGHTLINER...
2017 ADDCO ROAD SIGN DH1000-ALS (A60736)
2017 ADDCO ROAD...
2022 Harley-Davidson FLHTP Police Electra Glide Motorcycle (A60352)
2022...
500 BBL FRAC TANK (A58214)
500 BBL FRAC TANK...
 
Top