Ground Beams and pouring a new slab next to an existing one.

   / Ground Beams and pouring a new slab next to an existing one. #21  
Gotta remember that aggregate size and edge distance for rebar are also a factor.
 
   / Ground Beams and pouring a new slab next to an existing one. #22  
3 years ago I had a 24x40 6" 4000# slab poured for a metal barn. No rebar but 2 saw cuts and the slab cracked on the saw cuts. There is no difference in elevation on the floor. It cost me $1800.00 for concrete and $1300.00 cash for the pour and finishing. My neighbor did a 24x26 and spent $8100 for his slab with rebar and mesh. Bill C
 

Tractor & Equipment Auctions

2008 Isuzu NPR-HD Landscape Dump Truck (A56858)
2008 Isuzu NPR-HD...
2023 Kubota L6060HST Compact Utility Tractor (A55315)
2023 Kubota...
2019 International Bucket Truck (A55973)
2019 International...
2012 PROCO KILL TRAILER (A58214)
2012 PROCO KILL...
2023 Unverferth 3PT 10 FT Perfecta Field Cultivator (A55315)
2023 Unverferth...
2004 Freightliner FL60 Ambulance (A56858)
2004 Freightliner...
 
Top