47F and partly cloudy @ 11:00, heading up to around 54F for the day's high. 1% chance of precip. Low this morning was 30.2F.
Got the top platform all welded up after tacking miscue. Top:
Bottom:
Found that piece of 1" angle and brought it inside the shop and trimmed off a couple of pieces for the ramp.
Got the rest of the steel cut for the ramp and got it all tacked up. Top:
Bottom:
He'll need to do some clean up and a little trimming.
Friend will come by sometime after noon and we'll head over to his place to check the fit on the ramp and if good head back over here and I'll finish welding it up.
After I finished tacking things up yesterday I came back down to the house and got back to working on insulation/plumbing in the basement.
Got two more pieces of 2" foam board trimmed and dry fit around the pipe coming from the well. The one required some additional trimming for a window.
These can't be glued in place just yet as I need to sweat another piece of 1" copper pipe onto the 1" pipe coming from the well and there isn't enough distance to avoid smoking the foam board.
Also trimmed a 1" polyiso panel to length for the north wall where I got a set of metal shelves moved out of the way the other day.
After that I cleaned behind some HVAC ducting and used a bunch of scrap 1 1/2" foam board to insulate behind that as there wasn't enough clearance between the concrete wall and the duct work to use 2" foam board.
Then glued a piece of 2" foam board below the duct to more or less complete the foam board on the south wall. Just have to piece in a little area where some round duct goes to a register up in the dining room.
Noticed a big difference in surface temp on the foam board vs. the bare concrete wall.
After I finish the welding today, I may do a little leaf blowing if the sun is still out. It's supposed to be windy this afternoon so that may get put off until tomorrow when it's warmer with less wind.
Otherwise it will be back down into the utility room. Probably start trimming 2 x 4's for the studs and maybe get some sections of wall put up.
Need to check pre-charge in the pressure tank as I noticed the well pump is short cycling.
Otherwise just see what comes up.
Hope everyone is having a decent day ... 