Currently cloudy and only 49F with light rain, probably won't make that 51F high.
Hopper feeder refilled, also two suet feeders.
OSB and additional 8' lighting fixtures unloaded from van and car and moved to the barn.
Live trap checked - no customers ...
Height of bottom chord of trusses (sort of) verified (as best I could without climbing up there) - looks like they are 2 x 8's.
I need three 2 x 6 or 8's x 14' for concrete form boards for the overhead doors. Think I'll just reuse those after the pour for the framing for the attic access.
Length of liner panels (for the ceiling) verified - they're 20' 2"+.
I was worried they might only be 16' long which would probably have required a bunch of cutting.
As it stands now though, two pieces (end to end) will nearly cover the the width of the ceiling and I'll likely only a bit short - maybe less than 1'.
Will probably put the gap where I'm short in the center of the building ... maybe nail up some 2 x 4's on the bottom chords of the trusses and staple on some J-channel to set the liner panels in.
Woman fixed some tamales for lunch which hit the spot.
Menards order placed and ready for pick up.
Will be a solo trip so Woman can stay here and continue to get other stuff done.
Hopper feeder refilled, also two suet feeders.
OSB and additional 8' lighting fixtures unloaded from van and car and moved to the barn.
Live trap checked - no customers ...
Height of bottom chord of trusses (sort of) verified (as best I could without climbing up there) - looks like they are 2 x 8's.
I need three 2 x 6 or 8's x 14' for concrete form boards for the overhead doors. Think I'll just reuse those after the pour for the framing for the attic access.
Length of liner panels (for the ceiling) verified - they're 20' 2"+.
I was worried they might only be 16' long which would probably have required a bunch of cutting.
As it stands now though, two pieces (end to end) will nearly cover the the width of the ceiling and I'll likely only a bit short - maybe less than 1'.
Will probably put the gap where I'm short in the center of the building ... maybe nail up some 2 x 4's on the bottom chords of the trusses and staple on some J-channel to set the liner panels in.
Woman fixed some tamales for lunch which hit the spot.
Menards order placed and ready for pick up.
Will be a solo trip so Woman can stay here and continue to get other stuff done.