Ok, after checking:
1) ground cable connection clean
2) 12V through fuse to bat term on switch
3) switch "on" 12 v at run terminal
additional info (reading around more posts)..
4) jumping 2 big connection on solenoid, engine cranks
5) jumper wire from batt + to org/blk wire terminal on solenoid, engine cranks
1) ground cable connection clean
2) 12V through fuse to bat term on switch
3) switch "on" 12 v at run terminal
additional info (reading around more posts)..
4) jumping 2 big connection on solenoid, engine cranks
5) jumper wire from batt + to org/blk wire terminal on solenoid, engine cranks