oldboyscout
Silver Member
Thanks everyone for suggestions in my earlier thread. Now I'm finalizing a plan to put up a modular steel garage around 20x26.
It will be on gravel for now but I'd like to be able to concrete floor it in a few years.
Can I put down 6" of gravel (compact), then spike down PT 6x6 to put the garage frame on? This will allow me to pour concrete inside the 6x6's later. (using them as form/screed)
I need it mainly for a small project workspace in rain/snow and to store my small tractor and "shed stuff" like trimmers/chains/oil etc.
It will be on gravel for now but I'd like to be able to concrete floor it in a few years.
Can I put down 6" of gravel (compact), then spike down PT 6x6 to put the garage frame on? This will allow me to pour concrete inside the 6x6's later. (using them as form/screed)
I need it mainly for a small project workspace in rain/snow and to store my small tractor and "shed stuff" like trimmers/chains/oil etc.