Close to gettin' pics... My digital camera died and all pics are on film and they'll be developed in the next couple of days.
Got all the waterline in the ground, 500' and let me tell ya the little 'Bota with FEL and box blade makes covering a breeze.
90% of the plumbing is connected, I just need a couple of connectors and have a couple little drainage areas needing a bit of attention, eventually.
Lots of final grading is needed after all the utility ditches were dug but a day on the 'Bota and a hand hand rake will do wonders.
Working on the wiring. The pole is set with wire, mast pipe meter base etc and hope to have wired to the home today baring rain and hopefully inspected and turned on this week.
Those 8' ground rods are a pain in the butt, back, hands, shoulders etc.... The first wasn't bad I stuck it in the pole's hole and hammered it down another 2 foot (the pole is 6' deep). The second is in the underground ditch and I need about 6-8 inches deeper but now it's bending so I think I'm on rock.