I was wondering about the acclimation process myself. I'm hoping that being this is pre-finished hardwood, that perhaps that is less of an issue. I'll go look at one of the boxes to see what it says about it.
When I had the hardwood floors redone in my house, the contractor made a point of leaving it here for 3 days before starting. Now mom's house has no ceiling insulation yet, nor a working HVAC system yet. Last night temps got down near freezing and today they got up in the 70's. So huge temp swings. They started putting down the hardwood flooring within hours of it arriving Saturday....
They completed the hardwood flooring in 2 days (Saturday and Monday). 3 rooms have it, the 2 bedrooms and the office. At least it runs the same direction in all 3 rooms, which was not a given since none of it is connected.
These are not subs, the hardwood (and tile crew) are direct employees of the builder (as are the electricians, framers, roofers, and excavator). The only subs were:
Concrete
Plumbing
HVAC
Painters
Rock veneer
In the master bedroom, there are actually 2 door entrances in the same corner as seen here.
Here's the office
I think they made the right decision with running it in the direction they get, when you consider the 2 other rooms. I still need to measure the diagonals to see if the master bedroom room is square or not. The other 2 rooms do not appear to have the "drift" issue.
The 6x6 tile finally came in, so they were able to continue laying that down today
I told the tile guy yesterday to make sure the pattern would line up at the kitchen entrance and I suggested laying it down dry first to make sure there was no "drift" here either. Looks like he listened to my suggestion.
Sun room is grouted (as are the bathrooms). We went with a charcoal grout.
Moving outside, I have been trying to keep up with watering the lawn
I moved the one controller to the yard hydrant and told the tile guys to use the Y outlet for their water needs so that the automatic irrigation would always be pressurized for when the timers kicked off
I picked up another 4 station irrigation unit for the back yard.
I believe I am starting to see the little hair like sprouts now
But there is definitely quite a but of that unwanted broad-leafed crap grass as well. At least it will help hold things together during the next thunder storm (change Thursday and Friday)