sixdogs
Super Star Member
- Joined
- Dec 8, 2007
- Messages
- 13,769
- Location
- Ohio
- Tractor
- Kubota M7040, Kubota MX5100, Deere 790 TLB, Farmall Super C
We did this on a room in our last house but used unfinished cedar--the wood from the pacific NW that is often used for siding. It looked great and was an idea we stole from another house that had a ceiling done that way 25 years earlier. The slightly darker wood made the room look softer and the unfinished look was less reflective of light. Everyone liked it.
If I was going to finish the wood I would get a can of satin gloss real marine varnish with resins in it and thin 50-50 with paint thinner. The resins would give the wood character as it ages while synthetic varnish would keep it stark looking for generations. I've done this lots of times on projects.
We ran it lengthwise in the room.
If I was going to finish the wood I would get a can of satin gloss real marine varnish with resins in it and thin 50-50 with paint thinner. The resins would give the wood character as it ages while synthetic varnish would keep it stark looking for generations. I've done this lots of times on projects.
We ran it lengthwise in the room.
Jay,
I have been wondering how the T & G knotty pine is going to look on the ceiling in a room that is essentially 9 feet wide by 25 feet long.
It will be a key highlight of the interior. I imagine the plan is to run it lengthwise with the room which is going to mean a lot of butt joints and grain matching to get it right.
With 2 sliding doors and the other windows on the back wall the deck with the boards running from the house out to the rail will be visible at the same time as the ceiling from most locations.
Have you ever done a situation like this and run the ceiling boards from the peak down to the wall instead of horizontal?
I don't know if you could make a quick render showing it that way for comparison.
I'm not really sure I would even trust this contractors crew to install such a key element to the interior. Perhaps you should call Peter
and discuss having that part taken out of the job and you making a contract with him to fly up there and do the installation.