I'm sure this is a stupid question, but I need to know the answer regardless.
Okay, I'm hanging green (from the mill) 1x8 siding. Is there a drying time or a time period I need to wait to hang the battens? If so, how long? Do I nail the battens directly through the boards and into the girts or try and nail through just the battens into the girts?
 
   / Board and Batten Siding Question #2  
If you nail the battens on with a single row of nails, through the crack between the boards into the girts, you can put them on while everything is green. Do NOT nail through the boards themselves, or they will crack at the nails when they dry and shrink...
 
   / Board and Batten Siding Question #3  
See if you can find a copy of "Installing Board-and-Batten Siding" in Fine Homebuilding, July, 1992. The batten should go on as soon as possible after the boards are up so they don't cup as they dry out. The battens don't just cover up the joint. They also are to hold the edges of the boards flat. You may need to predrill your battens to avoid splitting.

Another tip is to lightly bevel the bottom edge of the boards and battens to form a drip edge.
 
   / Board and Batten Siding Question
  • Thread Starter
#5  
Thanks for the great info!
 

Tractor & Equipment Auctions

2013 Ford F150 4X4 Pickup Truck (A53422)
2013 Ford F150 4X4...
2015 FORD F-250 XL SUPER DUTY TRUCK (A51406)
2015 FORD F-250 XL...
SKID STEER BRUSH ATTACHMENT (A53843)
SKID STEER BRUSH...
2020 Caterpillar 259D3 Two Speed Compact Track Loader Skid Steer (A52377)
2020 Caterpillar...
2025 Swict 84in Bucket Skid Steer Attachment (A53421)
2025 Swict 84in...
2022 Quick Attach Brush Buster - Heavy-Duty Skid Steer Cutter for Brush and Overgrowth (A53473)
2022 Quick Attach...
 
Top