Attaching auger shaft to PTO SHAFT? field master post hole digger???

   / Attaching auger shaft to PTO SHAFT? field master post hole digger???
  • Thread Starter
#11  
They are about $64USD + shipping. They install easy just like a screwing in a light bulb. 10 seconds. It will take you longer to remove the overrun clutch part from the shipping box vs. installing one. The good thing other than the safety is the fact that the PTO access works even better since the connection to the implements is now 8-inches farther out from the tractor, but still in the PTO shielded area. :)

Oh, OK, I thought it was going to be in the clutch assembly its self, inside. I will order one.

Thanks RUMBLON
 

Tractor & Equipment Auctions

2012 Freightliner M2 106 Asphalt Pothole Patcher Truck (A51692)
2012 Freightliner...
2013 Magnum Power MLG08 Towable Light Tower (A55851)
2013 Magnum Power...
JOHN DEERE 1705/6700 LOT NUMBER 20 (A53084)
JOHN DEERE...
Utility Trailer (A52377)
Utility Trailer...
2020 Massey Ferguson 1840 Small Square Baler - High-Performance Hay Baler (A55301)
2020 Massey...
2018 KENWORTH T880 DAYCAB (A55745)
2018 KENWORTH T880...
 
Top