I found a place that will deliver asphalt millings for $200 a tri-axle load. Is it a good idea to run the asphalt millings the whole depth of the driveway or should I have something else in the base? I have close to 15" of topsoil to remove for my driveway, can I get away with just packing the top with a Bromag roller or do I need to pack it several times? THANK YOU! Driveway will be about 450'x10'
PS
I did read the other thread about asphalt millings on here. Got some great info but I still had questions.