He is in Vermont. The frost will grab the concrete and lift it. Better to use Sonatubes, wrapped in plastic. Or cut the end out of a 5 gallon bucket and slide that over the piling so that frost will move that instead.If you have a Post hole digger drill 4 holes and put a bag of Sakrete in bottom of each at 2-3' down, insert a J hook bent rebar or two in each and fill in. 4 60Lb bags are $5 each.
Or you can do a star pattern with three rebar pounded in at angles thru the bottom plate.