GreatWhitehunter
Veteran Member
I agree your's is a better location. I'd be careful evern calling that the "factory install" most of the custom install's I've seen have much better fit and finish.
Matt
Matt
I agree your's is a better location. I'd be careful evern calling that the "factory install" most of the custom install's I've seen have much better fit and finish.
Matt
Ok, to clear this up.
The 3rd SCV is hard lined, not hosed. The kit number is above. The valve was installed 100% according to the JD manual that came with the kit. Attached are the pictures from the JD website build your own. I mounted it exactly there. So I guess I can "be careful" in calling it the factory kit now?
The hose and hardline kit to run the third SCV to the loader. Again it was installed exactly by the instruction book with the kit. The hose were run inside the protective loom, new bracket installed, hoses were run along side the hardlines under the tractor. Now, I can run them under the seat and over the tranny and come out closer to the 3rd SCV valve. I elected not to since when I ran them through there there are multiple rub points that I was not comfortable with. I elected to run them along the hardlines that go to the 3rd SCV as shown in the picture. Maybe I should have washed and waxed it and set up some studio lights? I do plan to tie the hoses in the back in a little tighter.